Complexity Economics Engineering Society

Project Management: Why Cost Overruns and Late Delivery?

ComplexSituation

Why over 90% of projects finish late? There is plenty of literature on the subject. This is a good example. In multi-project environments, such as the one illustrated below things can get very complex as project share resources (financial, manpower, equipment, etc.).

 

project_portfolio

 

When it comes to project costs, similar statements can be made. American Planning Association in 2002 found that 9 out of ten construction projects had underestimated costs. Overruns ranged from 50% to 100%. Some illustrious examples:

  • Suez canal: effective cost was 20 times the original estimate
  • Sydney Opera House: 15 times
  • The Concord: 12 times

Other well-known examples: the F-35 fighter, Denver International Airport, Airbus A380, Boeing 787, Humber Bridge, Channel Tunnel, Berlin Brandenburg Airport.

Again, there is plenty of research on the subject and in general the following three causes are indicated: technical, psychological, and political-economic. In general, it comes down to poor risk analysis.

In this short blog we wish to focus on a particular technical aspect of risk analysis, especially when it comes to cost control. This is how a typical risk analysis works:

  • A project schedule is assumed – this produces the Gantt chart
  • Randomness is added to the various tasks, milestones, costs, etc.
  • A Monte Carlo realization of the project is executed thousands of times
  • The results are processed statistically in order to determine probabilities, expected values of cost and deliver time, etc.

The cost of a project is equal to the sum of component costs:

C_project = Cost_1 + Cost_2 + …. + Cost_N

In the Monte Carlo process, randomness is added to each of the component costs and thousands of realizations are executed. The first problem is how this randomness is modeled. There exist many probability distributions to choose from. In general, ‘expert opinions’ or conjectures are used to determine which distributions will be used.

However, the most fatal and, unfortunately, the most common mistake in Monte Carlo simulations is to ignore dependencies between the inputs. In other words, if, Cost_i and Cost_j are correlated, ignoring this correlation changes things pretty dramatically. Imagine what damage this can cause when thousands of component costs are considered. Computing project costs by simply summing up component costs and neglecting their inter-dependencies is a good example of anachronistic linear thinking. The most common excuse is: these inter-dependencies are awfully difficult to determine. So they are neglected. Once more, men become slaves of their tools and reality is bent to satisfy the said tools.

Basically, the above model should be:

C_project = Cost_1 + Cost_2 + …. + Cost_N + Nonlinear (coupling) terms

The nonlinear part is of course neglected.

An example of how neglecting the mentioned cost inter-dependencies impacts the resulting Tornado Chart (which ranks the component costs in terms of correlation with the total project cost) is:

cost_1_2

 

If that were not enough, correlations between the total cost and component costs are often over-estimated as pointed out in our previous blog.

The reasons why most projects are late and incur cost overruns are many. Lack of Project Complexity Management is certainly one. The objective of this blog, however, is to point out that, independently of political and psychological issues, seeing reality as linear while it is not, induces distortions with guaranteed adverse consequences on estimates of costs, schedules or probabilities of failure.

 

 

www.ontonix.com

 

 

 

 

 

 

 

 

Unknown's avatar

Established originally in 2005 in the USA, Ontonix is a technology company headquartered in Como, Italy. The unusual technology and solutions developed by Ontonix focus on countering what most threatens safety, advanced products, critical infrastructures, or IT network security - the rapid growth of complexity. In 2007 the company received recognition by being selected as Gartner's Cool Vendor. What makes Ontonix different from all those companies and research centers who claim to manage complexity is that we have a complexity metric. This means that we MEASURE complexity. We detect anomalies in complex defense systems without using Machine Learning for one very good reason: our clients don’t have the luxury of multiple examples of failures necessary to teach software to recognize them. We identify anomalies without having seen them before. Sometimes, you must get it right the first and only time!

2 comments on “Project Management: Why Cost Overruns and Late Delivery?

  1. António Tavares Flor's avatar
    António Tavares Flor

    My doctoral thesis deals with the subject overrun costs. It was published by the Court Portuguese

    I did Multimpact model that makes the prediction of financial slippage based on the historical behavior of the agents involved.

    Click to access 47ndx.pdf

    This thesis is organized in three parts, reflecting three kinds of Reasons: the
    complexity and uncertainty about the nature and singularities public work, the
    Those aspects of influence on the cost variation, and finally the proposal and use of
    the forecast model – the Multimpact model.
    Summarizing, this thesis presents the main conclusions Following:
    a) The development of a concept model, able to link cost variation and its
    causes;
    b) The cost variation can be described by the statistic exponential distribution
    c) The proposal of a model operating – Multimpact, connecting aspects of the
    management quality, the complexity and uncertainty associated with the
    project and the cost variation;
    d) Proposal of procedures having in view cost variation minimization.

    Liked by 3 people

Leave a reply to António Tavares Flor Cancel reply